The changes in Waycross began a while back when J3 (right) was lined with the new signal bridge towards the end of the train. The head end is passing the next phase of major rehab. |
Date:
3/18/2007 |
Location:
Waycross, GA Map |
Views:
654 |
Collection Of:
Kevin Andrusia |
Locomotives: |
Author: Kevin Andrusia
|
|
Picture Categories: |
This picture is part of album: Georgia Color 2007 |